Case Study

Owens Corning Standardizes on Aspen Plant Scheduler and Receives Rapid Deployment Results

Find out how Owens Corning went live concurrently across 14 manufacturing locations with Aspen Plant Scheduler in less than 12 weeks, and enabled schedulers to make decisions that were impossible to make just a few years earlier.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Oxiteno Plant Operations Reacts Quickly to Market Demand

Oxiteno has used the aspenONE® Engineering suite extensively over the past 25 years to modify and optimize current units, as well as design new units with complex configurations. Learn more.

Case Study

Petrochemical Production Facility Drives Value and Maximizes Return with Non-linear APC

Non-linear Advanced Process Control (APC) improved SCG’s product stability and quality, minimized variations, and enabled enhanced transition strategies.

Case Study

PEMEX agiliza la ejecución de proyectos con diseño optimizado y estimación de costo

Descubra por qué PEMEX eligió una solución de aspenONE para ayudarlo a construir un Centro de Excelencia para impulsar el rendimiento operativo.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Mine Moves from Calendar-based to Prescriptive Maintenance with Aspen Mtell

When one of the world’s largest fully integrated zinc and lead smelting and refining complexes wanted to improve their metallurgical operations, the company turned to Aspen Mtell® prescriptive maintenance.

Case Study

Petrofac Improves Process Design Accuracy by Debottlenecking Gas Processes Increasing Capacity by 20%

Download this case study to learn how Petrofac used Aspen HYSYS with Activated EDR models to optimize heat exchanger selection and configuration for a gas production client. This solution achieved the client's goal by increasing gas field production 20%, and as a bonus, reduced CAPEX 25%.

Case Study

Control Column Performance Using Aspen HYSYS®

Learn how Tupras used the column analysis capability in Aspen HYSYS and its integration with Aspen Exchanger Design & Rating to significantly increase the column capacity and meet the required product specifications.

Case Study

Pan Pacific Relies on Process Modeling to Optimize Algae-to-Biofuel Conversion (Aspen Plus)

Pan Pacific Technologies was seeking a rigorous approach to validate the technical and economic feasibility of its proprietary algal conversion concepts. Through innovative use of Aspen Plus and Aspen Process Economic Analyzer, they developed successful technical and economic models with applications in both academia and industry.

Page 57 of 221