Infographic

Why Model Accuracy is Important

Why is having an accurate planning model important? It demonstrates visually how a 1% error can cost millions.

Case Study

Importante fábrica química europea implementa software de planeación y programación para elastómeros y estirénicos

Conozca cómo una importante fábrica química europea implementó aspenONE Supply Chain Management y la integró con su sistema ERP de SAP pudiendo así reducir sus inventarios en un 20%, alcanzar un 97% de precisión para entregas a tiempo y reducir el número de transiciones de campaña en un 20%.

Case Study

Increasing Capacity in Sulfur Production Using Sulsim Modeling

Siirtec Nigi increased their sulfur production from 50 to 90 tons per day using Aspen HYSYS Sulsim to simulate the case study and conduct a sensitivity analysis around their oxygen enrichment. The new process required minimal equipment changes and no additional downtime other than turnaround.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Case Study

Multivariate Statistical Analysis Finds Cause of Quench Oil High-Viscosity Issue

One of the world's largest chemical, plastic and refining companies used Aspen ProMV to understand and resolve production problems caused by an ongoing quench oil high-viscosity issue. In this case study, learn how Aspen ProMV enabled the company to highlight the top process variables highly correlated with viscosity issues, and quickly guided process engineers to the underlying issue to limit losses.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Out-of-Spec Batches

Learn how a large producer of synthetic rubber used Aspen ProMV to identify the cause of ongoing quality issues with its batch products. Download the case study to read how Aspen ProMV uncovered the variables that correlated most with batch quality, resolving production problems faster to limit losses.

Case Study

Liquid Light Achieves Process Simplification and Reduces Costs

In order to meet their design need of maintaining a 25% cost advantage over conventional chemical processes, the engineers at Liquid Light needed a flexible software solution to find key property data (even for non-ideal and electrolyte systems), conduct “what-if” and case analyses, model reaction systems, select solvents, and scale-up quickly and reliably. Leveraging Aspen Plus and Aspen Properties, the members of Liquid Light have been able to make meaningful predictions about system behavior, moving them closer to full scale production.

Page 55 of 221