Professional Services

Accelerate time to value by leveraging comprehensive on-site and remote services to deploy industry-leading technologies faster and more efficiently than ever before.

Case Study

Pan Pacific Relies on Process Modeling to Optimize Algae-to-Biofuel Conversion (Aspen Plus)

Pan Pacific Technologies was seeking a rigorous approach to validate the technical and economic feasibility of its proprietary algal conversion concepts. Through innovative use of Aspen Plus and Aspen Process Economic Analyzer, they developed successful technical and economic models with applications in both academia and industry.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Brochure

Aspen Plus New Feature Comparison Chart

Aspen Plus has been updated and improved with additional features over the last few years. From concurrent engineering to integrated solids modeling and batch modeling, experience the latest innovations in chemical process simulation. This checklist shows the addition of features and incremental improvements by version.

Brochure

Aspen HYSYS New Feature Comparison Chart

Aspen HYSYS has been updated and improved with additional features over the last few years. From concurrent engineering to integrated gas plant modeling and refinery-wide modeling to streamlined process safety analysis, experience the latest innovations in chemical process simulation. This checklist shows the addition of features and incremental improvements by version.

Ebook

Optimize for the “Business Trifecta”, Safety, Sustainability and Productivity

Discover how predictive maintenance and planned downtime can deliver positive results for your company when it comes to Safety, Sustainability and Productivity.

Ebook

Asset Performance Management: Industry Insights 2019

Get key insights from a 2019 ARC Advisory Group survey on asset performance management (APM) and learn what is most important to industry leaders implementing APM at their organizations.

Case Study

Korea's SK E&C Reduces Engineering Estimating Man-Hours by 50% With Aspen Capital Cost Estimator™

Learn how SK Engineering & Construction improved the speed and accuracy of their capital project cost estimates with Aspen Capital Cost Estimator (ACCE).

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

Case Study

Maturus Optimi Gets Out of the Gate Fast

Learn how Maturus Optimi leveraged the aspenONE Engineering Desktop to manage business risk in a small company through affordable, scalable access to software. Maturus Optimi helped clients achieve better capital estimates during the feasibility study and early conceptual designs solved difficult process problems with access to a complete suite of best-in-class modeling tools.

Page 1 of 46