On Demand Webinar

Aspen Economic Evaluation Family コスト積算ツールの活用による迅速かつ確度の高いプロジェクトコスト見積り方法の紹介

コスト積算ツールであるAspen Economic Evaluation Familyを紹介します。一般的に確度の高いプロジェクトコストの見積りを得るためには多くの労力と時間を必要としますが、そのために競争優位を失ってしまいます。 今回紹介するAspen Economic Evaluation Familyでは、最新のコストデータ、設備のコストカーブ、標準P&IDに基づき、確度の高い見積りを迅速に簡単に得ることが可能となり、意思決定までのリードタイムの短縮化が可能となります。

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Graham Hart

Graham Hart achieves 97% on time delivery of complex heat exchangers through use of HYSYS and Aspen EDR.

Executive Brief

스마트 엔터프라이즈를 위한 차세대 운영 기술

전세계적으로 시장 상황의 변동성과 불확실성, 복잡성과 모호함이 가중되고 있는 VUCA (Volatile, Uncertain, Complex and Ambiguous) 환경에서 기업들은 경쟁 우위를 확보하기 위해 Industry 4.0과 AI 등 새로운 기술들을 도입하고 있습니다. 이 백서에서 선도적인 기업들이 어떻게 디지털 엔터프라이즈를 뛰어 넘어, 진정한 의미의 미래형 스마트 엔터프라이즈로 거듭나고, 지속 가능한 운영 효율성을 달성할 수 있는지 확인해 보십시오.

Executive Brief

Tecnologías operativas de última generación:Facilitar la empresa inteligente en un mundo cambiante

A medida que las organizaciones en todo el mundo buscan la manera de prosperar en medio de condiciones de mercado volátiles, inciertas, complejas y ambiguas (VUCA por sus siglas en inglés), muchas recurren a las tecnologías de la Industria 4.0 y a las nuevas capacidades de IA para obtener una ventaja competitiva. Descargue este documento para aprender cómo los líderes del mañana crearán no solo la empresa digital, sino una empresa del futuro que sea verdaderamente inteligente, y de igual forma podrán alcanzar la excelencia operativa que será sostenible independientemente de las condiciones del mercado.

Case Study

Global Refinery Deploys Cost Estimation Solution to Accelerate Decision Making and Lower Costs

Phillips66 improves estimating productivity by 85% and reduces estimating variability to +/-15% with a five year before and after analysis of estimates vs. completed projects. Download the case study to learn more.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

On-Demand Webinar

Improve Collaboration on Estimates Early in Your Project

Set yourself up for success with better estimating earlier in the bidding process. Hear how estimators and process engineers are collaborating to automate handoffs and run a higher volume of scenarios for more accurate estimates.

On-Demand Webinar

Improve Capital Project Planning and Performance with Model-Based Estimating featuring Harvey Welker

In today’s business environment, shaving capital costs from upstream and midstream projects is critical. With the right estimating system, EPCs and owners can reduce project risk by identifying engineering challenges at the earliest stages of a project. In this webinar, estimating consultant Harvey Welker will describe how some of the world’s leading owner operators have avoided millions of dollars in engineering mistakes and cost overruns using a model-based estimating approach.