Micro Case Study: Petronas
A snapshot of the full Petronas case study by providing the problem, approach, solution and benefit at a high level.
Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets
Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.
Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator
Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.
Acid Gas Cleaning Validation: Liquid Hydrocarbons
Learn about the acid gas removal process and underlying technology for the Acid Gas - Liquid Treating Property Package in Aspen HYSYS used for solvents used for treating liquid hydrocarbons. Validation results
Strategic Estimating Systems (SES)
Learn how SES, one of the leading estimating organizations worldwide, saves 70% manhours using ACCE. SES is responsible for, estimating projects such as SADARA, Suncor Tar Sands, and Mozambique LNG using ACCE.
S&B Engineers Case Study
Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.
The Aspen DMC3 Difference
Learn how Aspen DMC3 enables you to shape the economics of APC solutions to meet business objectives and modify the behavior of the controller to fit the needs of any phase of the lifecycle.
Aspen Plant Scheduler
Generate optimal production schedules to maximize profitability and meet service levels with the Aspen Plant Scheduler Family.
Linde Engineering Efficiency Across Project Lifecycle
Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6. They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.
Cabot Streamlines and Standardizes Scheduling, Greatly Improving Visibility
Learn how specialty chemical manufacturer’s Carbon Black business implements Aspen Plant Scheduler at more than 20 plants worldwide to close the gap between planning and execution.