Micro Case Study
Micro Case Study: Borealis
A snapshot of the full Borealis case study by providing the problem, approach, solution and benefit at a high level.
Micro Case Study
Micro Case Study: Petronas
A snapshot of the full Petronas case study by providing the problem, approach, solution and benefit at a high level.
White Paper
Acid Gas Cleaning Validation: Liquid Hydrocarbons
Learn about the acid gas removal process and underlying technology for the Acid Gas - Liquid Treating Property Package in Aspen HYSYS used for solvents used for treating liquid hydrocarbons. Validation results
Case Study
S&B Engineers Case Study
Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.
White Paper
The Aspen DMC3 Difference
Learn how Aspen DMC3 enables you to shape the economics of APC solutions to meet business objectives and modify the behavior of the controller to fit the needs of any phase of the lifecycle.
Brochure
Aspen Plant Scheduler
Generate optimal production schedules to maximize profitability and meet service levels with the Aspen Plant Scheduler Family.
Case Study
Linde Engineering Efficiency Across Project Lifecycle
Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6. They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.
Page 292 of 339