Case Study | S&B Reduces Cost Estimating Time Up to 90%

Discover how S&B Engineers & Constructors was able to react faster to volatile competitive and economic conditions using ACCE.

Case Study

S&B Engineers and Constructors Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules

To remain competitive, S&B looked beyond the traditional approach of producing project estimates to find a solution that was faster and more tailored to the process industries. Learn how S&B saves significant time and is able to dedicate more resources to analysis and evaluation using Aspen Capital Cost Estimator.

Case Study

Hello . If this is not you

Thank you for downloading this case study

If your download did not begin automatically, click here

Other Related Content

  • Whitepaper:

    Enabling Better Project Outcomes: Six Tips for Faster, More Accurate Cost Estimates

    Download
  • On-Demand Webinar:

    Beyond the Spreadsheet: Introduction to ACCE for Improved Estimating Speed and Accuracy

    Watch